Stop disturbance first
Pause work around suspect material. Do not collect a sample, sweep debris or use a photo or building age to identify material.
Safety-first project routing
Start with a stop-work boundary, define the project, separate assessment, laboratory and abatement roles, and build the document path before work.
Stop-work chain
Move forward only when the preceding role and record supports the proposed disturbance.
Define exactly which areas and materials the project may affect.
Connect competent assessment, controlled sampling, custody and laboratory results.
Crosswalk the inventory to work areas, controls, waste and required closeout evidence.
Choose the next decision
Start with the page that matches the uncertainty you need to resolve—not a preset solution.
Prepare project scope, records, assessment questions, laboratory dependencies and report outputs before renovation or demolition disturbance.
Open guide →02Separate assessor or surveyor competence, sampling, chain of custody, laboratory analysis, result interpretation and inventory outputs.
Open guide →03Normalize inventory basis, work areas, controls, occupancy, waste, monitoring roles, changes and closeout records.
Open guide →04Organize records, authority, occupants, access, work-area separation, schedule changes and document control in occupied properties.
Open guide →05Record current contractor licensing evidence, legal names, scope, checked date, expiry and regulator questions without copying a static roster.
Open guide →06Compare prerequisite reports, quantities, roles, controls, occupancy, changes, waste, clearance boundaries and records.
Open guide →Decision file
Pause work around suspect material. Do not collect a sample, sweep debris or use a photo or building age to identify material.
Write down exactly what may be cut, removed, penetrated or demolished and where. Assessment scope depends on planned disturbance.
Map who assesses, who samples, which laboratory analyzes, who prepares the report, who performs abatement and who provides any monitoring or clearance evidence.
Connect the assessment or survey, sample record, laboratory result, inventory, abatement scope, work records, waste documents and closeout evidence without skipping prerequisites.
Primary references
Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.